The third question is very important one. You can write about test Director, Win runner/Load runner, McCable or any other coverage tool. Test director is useful to track defect. WR or LR to do functionality/Load testing, Coverage tool to check the code coverage thereby helping in White box testing.] 8. You are working on a project, where the requirements change dynamically. The data in the project comes from various ends (from various Platforms) and are inter-dependent. You see this as a big risk in the project. How would you plan accordingly? [15 Marks] Answer: Give a Plan which takes care of the risk and is identified in the Risk Areas. Say that the testing scope would concentrate more on Data driven tests etc.]
Image of page 2
CSTE Mock Test - Part IV – Questions Along with Answers Page 3 of 4 9. Describe the Differences in between: [15 Marks] 1) Smoke & Sanity testing 2) Validation & Verification 3) Test Effectiveness & Test efficiency Answers: Smoke Sanity Smoke testing is a shallow and wide approach to the application. You test all areas of the application without getting too deep. Sanity testing is usually narrow and deep. That is they look at only a few areas but all aspects of that part of the application. A smoke test is scripted--either using a written set of tests or an automated test A sanity test is usually unscripted. Validation Verification Am I building the right product Am I building the product right Determining if the system complies with the requirements and performs functions for which it is intended and meets the organization’s goals and user needs. It is traditional and is performed at the end of the project. The review of interim work steps and interim deliverables during a project to ensure they are acceptable. To determine if the system is consistent, adheres to standards, uses reliable techniques and prudent practices, and performs the selected functions in the correct manner. Am I accessing the right data (in terms of the data required to satisfy the requirement) Am I accessing the data right (in the right place; in the right way). High level activity Low level activity Performed after a work product is produced against established criteria ensuring that the product integrates correctly into the environment Performed during development on key artifacts, like walkthroughs, reviews and inspections, mentor feedback, training, checklists and standards Determination of correctness of the
Image of page 3
Image of page 4

You've reached the end of your free preview.

Want to read all 4 pages?

  • Fall '19
  • Test Manager

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask ( soon) You can ask (will expire )
Answers in as fast as 15 minutes
A+ icon
Ask Expert Tutors