Manufacturers local availability the national

  • No School
  • AA 1
  • 75

This preview shows page 19 - 27 out of 75 pages.

Manufacturers Local Availability The national production capacity limits the supply of modules for the contracted PV Projects, one of the main bottlenecks nowadays is the delivery time , for both local and international delivery. Note.: Enterprises with signed contracts, but that are not under construction, were not accounted for.
Image of page 19
25.59% 21.29% 12.99% Trina 3.80% 1.30% 5.64% Jinko 29.40% Canadian Solar BYD JA Solar GCL First Solar PV Modules Regarding Projects in Operation, under test or Construction, 2017. PV Modules Supply (1,955.4 MWp) Note.: Projects with signed Modules supply contracts, but that are not constructed or under construction, were not accounted.
Image of page 20
25.79% 9.44% 5.66% 3.77% 1.89% GE Fimer 40.24% SMA Ingeteam 13.21% WEG Power Eletronics Siemens PV Inverters Regarding Projects in Operation, under test or Construction, 2017. Inverters Supply (1,589.7 MWac) Note.: Projects with signed Inverter supply contracts, but that are not constructed or under construction, were not accounted.
Image of page 21
8,75% 91,25% Structure Type Fixed Single Axis Tracker Advantages The use of single axis trackers improves the power generation, even in conditions of low latitude (most enterprises in Brazil). Reduce the accumulation of dirt on the modules. Disadvantages Greater complexity to assembly. Increase mechanical assembly cost. They occupy greater area due to the greater spacing between the tables (shading). Structures Regarding Projects in Operation, under test or Construction, 2017. Note.: Projects with signed Structure supply contracts, but that are not constructed or under construction, were not accounted.
Image of page 22
42.17% 21.62% 16.36% 7.52% 4.37% 4.37% 3.59% Soltec NEXTracker Convert Italia STI Norland Brafer Nclave PVH Note.: Projects with signed Structure supply contracts, but that are not constructed or under construction, were not accounted. . PV Structures / Tracking Regarding Projects in Operation, under test or Construction, 2017. Structure Supply (1.955,4 MWp)
Image of page 23
25.64% 21.62% 15.06% 12.54% 8.75% 3.37% 3.59% 5.64% 1.92% 1.88% Prodiel Biosar Enerray SNEF Grupo Cobra WEG GRS ATP Quebec Araxá Solar 10º Note.: Enterprises with signed contracts, but that are not under construction, were not accounted for. EPC (Engineering, Procurement and Construction) Regarding Projects in Operation, under test or Construction, 2017. EPC (1,955.4 MWp)
Image of page 24
DRIVERS How Macroeconomic and other key drivers can affect the PV Projects
Image of page 25
Introduction This chapter shows the impact of the main drivers on the viability and profitability of a PV Plant. A proper balance of CAPEX/OPEX, an optimal capital structure and a realistic vision of the macroeconomic conditions have a direct impact on the project profitability. A proper evaluation of the scenarios and the market trends can make a difference in a safe bid in the auctions. Macroeconomics Scenarios 2017, 2018, 2019 and 2020 Plant Location Local Modules Technical Characteristics CAPEX Composition Productivity, Grid Connection Price Scenarios Brazilian Economics Selic Rate, Inflation, Exchange Technologies Modules, Inverters, Structure Financing Development Banks, Private Funding Operation & Maintenance of OPEX, Exchange Inverters Imported Modules Price Scenarios Cost Structure CAPEX: Local Modules & Int’l Modudles
Image of page 26
Image of page 27

You've reached the end of your free preview.

Want to read all 75 pages?

  • Fall '19
  • Photovoltaics, Weighted average cost of capital

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask You can ask (will expire )
Answers in as fast as 15 minutes
A+ icon
Ask Expert Tutors