7.Given the information below, complete the MRP record and explain what it tells the inventory analyst to do.Lot Size Rule: Fixed Q = 200 unitsSafety Stock: 0 unitsLead Time = 2 weeksCurrent On-Hand Quantity = 100 unitsWeek12345678Gross Requirement50100600 05090200Scheduled Receipts200Projected On Hand 100Planned ReceiptsPlanned Order ReleaseANS:Lot Size Rule: Fixed Q = 200 unitsSafety Stock: 0 unitsLead Time = 2 weeksCurrent On-Hand Quantity = 100 unitsWeek12345678Gross Requirement50100600 05090200Scheduled Receipts200
We have textbook solutions for you!
The document you are viewing contains questions related to this textbook.
Economics
The document you are viewing contains questions related to this textbook.
Chapter 21 / Exercise 3
Economics
Arnold
Expert Verified
PTS:18.A manufacturing company is interested in making a product structure tree for one of its major products. They know that product A is made up of assemblies B, C, and D. Each B assembly is made up of one raw material F, and 2 E parts. Each C assembly is composed of 2 G parts and one H subassembly. Each H sub-assembly is made up of 2 F raw materials, 2 1 parts and 2 J parts.a.How many units of part G are needed to make one unit of product A?b.How many units of raw material F are needed to make up one unit of product A?
PTS:19.A company makes traffic signals for downtown streets. They are interested in developing a product structure tree for one of their traffic signal models. Each traffic signal is composed of a housing and bracket assembly. Each housing assembly is composed of optical and casing sub-assemblies. Each bracket assembly is composed of a hanger part and a wire outlet part. The optical sub-assembly is composed of 4 wire lead sub-assemblies, 3 lens parts, 3 bulbs, and 3 socket parts. Each casing sub-assembly is composed of 3 plastic molds and 3 hardware sub-assemblies. Each wire lead
sub-assembly is made up of 1 conductor part, 1 insulation part, and 4 spade connector parts. Each hardware subassembly is made up of 4 nuts, 4 bolts, and 8 washers.a.How many spade connectors are needed to make one traffic signal?b.How many bolts are needed to make one traffic signal?