5 Is scope control integrated with the quality control quality assurance risk

5 is scope control integrated with the quality

This preview shows page 1 - 2 out of 2 pages.

5-Is scope control integrated with the quality control, quality assurance, risk management, safety and health? Q2- Discuss some of the external influences on cost management that were present in the Big Dig and explain how you would manage those external influences to control both cost growth and schedule extension. For a project that was very expensive and public such as the Big Dig, the external factors play a big role in their influence on the project. As Greiman mentioned in her book about the Big Dig some of the cost external factors that influenced the project were: Regulatory and political changes, community concerns, market forces, inflation and unforeseen events and the best way to control them would be to anticipate and incorporate them in the estimate. Also, the potential of the schedule delays should be built into the project construction contingency and inflation cost estimate. (V. Greiman 2013) Develop fully integrated cost and resource project schedules to provide greater understanding to managers and/or the public in tracking and managing the whole project. (Greiman 2013). Q3- Using your readings, lecture materials and outside literature discuss three performance measurements you would recommend for a major project like the Big Dig and how you would (1) monitor; (2) control; and (3) enforce these measurements.
Image of page 1
Image of page 2

You've reached the end of your free preview.

Want to read both pages?

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture