5) The largest amount of software life cycle cost comes during the design and development. [Relate the typical distribution of software life cycle costs to the planning of an acquisition program.]FalseTrue
6) __________ consists of all costs associated with developing, procuring and housing a weapon system. [Given a cost breakdown, determine Development Cost, Flyaway Cost, Weapons System Cost, Procurement Cost, Acquisition Cost, and Life Cycle Cost.]
Program Acquisition CostFlyaway CostWeapon System CostLife Cycle Cost7) What is the weapon system cost of this system?
[Given a cost breakdown, determine Development Cost, Flyaway Cost, Weapons System Cost, Procurement Cost, and Life Cycle Cost.]
8) The Air Force is in process of completing development on an upgrade to an existing fighter aircraft that will improve survivability and reliability. The contractor has providedthe Government with detailed technical drawings and associated costs of the parts, materials, and labor required to produce the system. What cost estimating technique