Authorization and Authenication User ID Password Password Recovery System

Authorization and authenication user id password

This preview shows page 56 - 60 out of 73 pages.

Authorization and Authenication User ID/ Password Password Recovery
Image of page 56
System Anlysis And Design Email module Email is module as FAQ section. It helps to recover password if forgot. When Members forgot their password they can get back their password with matching their id and emai Milestones and Timelines Project schedule for the proposed system. S.N. Title of the Stage Explanation Duration 1. Feasibility Specification Feasibility specification is done by the software developer with the view of client’s satisfaction. The feasibility of the system is done whether the proposed system is technical or not, whether the system is economical and the proposed system is legally authorized with the government. Week 1 and 2 2 Technology Specification Mostly the technology specification is done whether the proposed system can be done with the available equipment with the existing technology or not. Does the proposed system require new technology? Therefore, it Week 3 and 4 Email Maintenance User ID/Name Forgotten ID Password Forgotten Password
Image of page 57
System Anlysis And Design finds the proposed system needs in the project. 3 Designing phase of the system After the system has been analyzed by the analyst, the design stage of system life cycle begins. In design phase, the design of the proposed system is finalized, Design of flowchart and pseudocode. Week 4-7 4 Implementatio n of the front- end of the system. Implementation is the main screen, giving the login, in this stage the login screen is implemented and the users are provided their individual login details and that follows the login giving various options. Week 7-9 5 Integrating the front-end with the database The front-end which has been completed in the previous stages will now be able to update the database. Other features like mail notification etc. should be functional at this stage. In short, the system should be ready for next stage i.e. integration testing. Week 10-12 6 Integration Testing Once all the modules are tested individually by running the test case for the system. But testing of individual module doesn't guarantee that the system will work smoothly when the units are integrated. Week 13-14 7 Final Review of the system Issues that are found in the part of testing are fixed. At the final review of the system, it should be checked that the all the requirements are specified during the development of project are fulfilled or not. While using the system when any error or any issues found after the implementation of the system. These are all fixed and the system is ready for the final analysis. Week 15-16 PHOENIX COLLEGE MANAGEMENT SYSTEM
Image of page 58
System Anlysis And Design S. No . THE STAGE Weeks 1 ST 2 nd 3 rd 4 th 5 th 6 th 7 th 8 th 9 th 10 th 11 th 12 th 13 th 14 th 15 th 16 th 1 Feasibility Specification 2 Technology specification 3 Designing phase of the system 4 Implementation front-end of the system 5 Integrating the front-end with the database 6 Integration testing 7 Final Review Fig: Gantt chart “phoenix college management system’ Methodologies Used
Image of page 59
Image of page 60

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture