Rate Production Decision Review? [29c (2). Identify the primary Test and Evaluation(T&E) products required at each acquisition milestone.][Remediation Accessed :N] DOT&E Report on Initial Operational Test and Evaluation (IOT&E) Live Fire T&E Waiver LRIP Article Quantities Approval Early Operational Assessment 2) The operational effectiveness and operational suitability questions that must be addressed during Operational Test and Evaluation (OT&E) to assess the system's capability to perform its mission are called ___________.[29c. Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.]
Background image
Critical Operational Issues Critical Technical Parameters Measures of Performance Key Performance Parameters (COI) (CTP) (MOP) (KPP)1) The Test and Evaluation Master Plan (TEMP) is mandated by DoD policy and must be updated periodically to ensure that it stays current as the program evolves through the life cycle. [Recognize how the Test and Evaluation Master Plan (TEMP) generation, staffing and approval process integrates all functional disciplines throughout the acquisition life cycle.]FalseTrue2) Who would certify the interoperability performance of a command and control system used by both the Army and the Navy? [Identify the key T&E support organizations within DoD.](JITC)Staff
Background image
and Evaluation Activity (OPTEVFOR)(JROC)3) Which one of the following test and evaluation (T&E) products is required at Milestone C? [Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.]ResultsReport(EOA)(IOT&E)4) Operational Measures of Effectiveness (MOE) and Measures of Suitability(MOS) are formally documented in the ________. [Identify the primary Test andEvaluation (T&E) products required at each acquisition milestone.][RemediationAccessed :N] (TEMP)Strategy
Background image
(ICD)(WBS)5) Joint Interoperability Test Command (JITC) has primary responsibility for developmental test and evaluation (T&E) functions throughout DoD. [Identify the requirements for interoperability testing.]TrueFalse6) The final approval authority for system-related National EnvironmentalPolicy Act (NEPA) documentation is the: [Identify the information required for amilestone review regarding environmental, safety, and occupational health issues.][Remediation Accessed :N] Component Acquisition Executive Program Manager Environmental Under Secretary of Defense (Environmental (CAE)(PM)coordinatorSecurity)
Background image
7) Threshold values, establishing (minimum) parameters for a system, and objective values, establishing desired parameters for a system, can be foundin the: [Identify the information required for a decision review and recognize the significance of
Background image
Image of page 16

You've reached the end of your free preview.

Want to read all 34 pages?

  • Spring '17
  • operational test, acquisition program, Test and Evaluation

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture