4 Enter the name UnitB 5 Select the Function1 folder in the left hand window

4 enter the name unitb 5 select the function1 folder

This preview shows page 37 - 41 out of 56 pages.

4 Enter the name "Unit_B". 5 Select the "Function(1)" folder in the left-hand window below the "Unit_B" folder. 6 Use the right-hand mouse button to select the "MOTOR(1)" object in the right-hand window and click on "Rename" in the pop-up menu. Enter the name, "MOTOR2", and press the "ENTER" key. Use the right-hand mouse button to select the "PIDCTRL(1)" object in the right-hand window and click on "Rename" in the pop-up menu. Enter the name, "PIDCTRL2", and press the "ENTER" key. Use the right-hand mouse button to select the "VALVE1(1)" object in the right-hand window and click on "Rename" in the pop-up menu. Enter the name, "VALVE2", and press the "ENTER" key.
Image of page 37
Creating Unit_B Using a Copy of Unit_A Getting Started PCS 7 - First Steps Documentation 5-2 C79000-B8276-C535-02 Result Figure 5-1: Creating Unit_B by Copying Unit_A
Image of page 38
Getting Started PCS 7 - First Steps Documentation C79000-B8276-C535-02 6-1 6 Configuring and Interconnecting Measuring Points 6.1 Configuring and Interconnecting Measuring Points In the Process Object view the signals are first inserted and then the parameter values modified. Prerequisites The SIMATIC Manager is open and the "fast_MP" project is displayed in the Process Object view with all the opened hierarchy folders. Procedure Step Procedure 1 Click on the "Plant" folder in the Process Object view in the left-hand window. 2 Click on the "Signals" tab in the right-hand window. 3 In the right-hand window divide the display window into two sections by positioning the cursor over the bar on the left next to the lower horizontal scroll bar until the divide symbol is displayed and then move the bar to the middle of the display window. Then slide the bar of the left-hand horizontal scroll bar until the columns "Chart", "Block" and "I/O comment" are displayed in the left-hand window. Use the Split symbol on the column margins in the column heading in order to hide or reduce the columns. Next slide the bar of the right-hand horizontal scroll bar until the "Signal" column is displayed. Sort the "Chart" column in ascending order by clicking on the "Chart" column heading. 4 Use the right-hand mouse button to click on in the "Signal" column for "MOTOR1" chart and "FB_ON" block and click on "Insert signal" in the pop- up menu. In the "Insert Signal" dialog box right-click in the right-hand window on the "Inputs" folder and then on "Open" in the pop-up menu. In the hardware configuration the signal names were selected so that they are combined from the names of the measuring point, "Chart" column, and the name of the channel drivers, "Block" column. Select the "MOTOR1-FB_RUN" signal correspondingly in the "Insert Signal" dialog box in the right-hand window and then click on the "Apply" command button. In the Process Object view the inserted signal is applied automatically in the "Signal" column and the next cell is selected.
Image of page 39
Configuring and Interconnecting Measuring Points Getting Started PCS 7 - First Steps Documentation 6-2 C79000-B8276-C535-02 Step Procedure 5
Image of page 40
Image of page 41

You've reached the end of your free preview.

Want to read all 56 pages?