Establishing the Product Support Management IPT consisting of Government and

Establishing the product support management ipt

This preview shows page 5 - 9 out of 20 pages.

Establishing the Product Support Management IPT, consisting of Government and private-Understanding Warfighter requirements in terms of performanceCreating a Business Case AnalysisDesignating Product Support Integrator(s)sector functional experts and appropriate stakeholders16.) At which point in the life cycle does the Life Cycle Sustainment Plan (LCSP) focus on development of sustainment metrics to influence design, the product support strategy, and on actions that can be taken prior to the next milestone to reduce future operatingand support costs?
Background image
17.) Defense policy requires designated systems to be certified as interoperable. In part, testing to ensure interoperability is conducted to determine if the system is:specialized training.18.) What documentation must be completed prior to a milestone review for a program that will significantly affect the quality of the environment?Module 2 Exam, Part I (contains 3 questions)Here is your test result.The dots represent the choices you have made.The highlighted questions are the questions you have missed.Remediation Accessed shows whether you accessed those links.'N' represents links not visited and 'Y' represents visited links.1.) The Test and Evaluation Master Plan (TEMP) links together, and must be consistent with, which of the following related program documents (Select all that apply)?
Background image
Acquisition Program Baseline (APB)Initial Capabilities Document (ICD)Systems Threat Assessment (STA)Systems Engineering Management Plan (SEMP)2.) Who would certify the interoperability performance of a command and controlsystem used by both the Army and the Navy?3.) Threshold values, establishing (minimum) parameters for a system, and objective values, establishing desired parameters for a system, can be found in the:Acquisition Program BaselineInitial Capabilities DocumentIntegrated Systems Engineering/Business Management PlanAcquisition Strategy
Background image
Module 2 Exam, Part I Here is your test result.The dots represent the choices you have made. The highlighted questions are the questions you have missed.
Background image
Image of page 9

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture