improved maintenance manpower schedules and utilization and production plans by indicating as correctly as possible the service timings and frequencies. The analysis of failure parts or poor material, bad workmanship, both by production or the maintenance workers, faulty design, and faulty operation (indicating that the operator needs training). In the planned maintenance systems, one important area, which ahs to be taken care of is calibration. This function is so important that it has to be catered to separately and specifically because, without calibration checks, one is not sure of the output results. Hence, the needs for calibration with properly trained manpower become imperative. 10.3.2.4 Preventive Maintenance Preventive maintenance system refers to those critical systems, which have to reduce the likelihood of failures ot the absolute minimum, for example, operation of an aircraft, which files from one place to another, or critical installation s within power plant, and the forced ventilation system in underground mines. To prevent breakdowns, preventive planned servicing is carried out with the specific objective of detecting locating weak areas and ensuring perfect functioning by even replacing certain critical parts which could still be used, but-for the assurance or ratability we demand. Thus, after each servicing, the equipment is considered to be as good
Image of page 143

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
138 as new and is expected to give a high level of reliable performance. It maybe noted that in addition to this servicing, planned inspection and servicing will continue to be carried out in the interval between two planned preventive servicing which are also aimed at achieving elimination of possible breakdowns. Thus at an added cost, a very high level of reliability of performance is assure or obtained. Planning and implementation of preventive maintenance system with the added cost of replacement of certain parts / components before they actually do fail, makes this an expensive system, and hence ought to be applied with caution and care to really critical equipment only. Statistical methods are usually employed to determine the life expectancy’ of components / parts / spares to fix the replacement periods accurately. In large complex plants, therefore, preventive engineering has been established and is becoming an important need and function. This basically involves a detailed analysis of breakdown failures and incidents. An incident is defined as happenings, which might lead to, or is a prelude to a serious accident or failure. The analysis indicated the areas of concern where real effort is needed, and where one can reduce chances of breakdown by redesigning, substitution, changes in specification, material or Design improvement, and modifications.
Image of page 144
Image of page 145
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern