FAA worksheets are provided on page 12 of these instructions Determine the ASV

Faa worksheets are provided on page 12 of these

This preview shows page 5 - 8 out of 13 pages.

methodology for short-term planning and the information provided in Tables 1 and 2. FAA worksheets are provided on page 12 of these instructions. Determine the ASV for Year 27 and Year 32. Explain how these ASVs compare to demand at the airport. Plot a graph that charts ASV, 60 percent of ASV, and Annual Demand for the Years 27 and 32. Figure 2 provides an example of what this graph should look it. Analyze your graph and report your findings. As part of your discussion answer the following question: What is the potential impact of the runway closure in the Year 32? Figure 2 – ASV Chart Example 5. SITE SELECTION STUDY This section should identify a suitable alternative site for Deer Valley Airport and conduct an alternatives analysis. The area of the alternative site should be able to accommodate all of the existing facilities at the current airport and provide space for growth. You may use image from google maps or google earth in your site selection. At least three alternative sites should be identified and evaluated. The following should be considered: 1. Convenience to population, including proximity to highways, railroads, or other modes of surface transportation 2. Airspace 3. Surrounding obstructions 4. Availability for expansion 5. Availability of utilities 6. Meteorological conditions 7. Environmental and Noise impacts
Image of page 5
AVM 3201 – Aviation Planning Case Study Deer Valley Airport – Demand/Capacity Analysis and Site Selection Study Page 6 of 13 6. RECOMMENDATIONS This section should state your recommendations for Deer Valley Airport. These recommendations should be based on your demand/capacity analyses and site selection study. Identify any further infrastructure development that is required both on and off-airport to support the future airport operations. Report Requirements A good way of getting your paper done on time is to start early. The following requirements must be met: 1. Report figures tables should be appropriately titled and sourced. 2. Worksheets and supporting calculations should be place in an appendix. Blank worksheets have been provided for you. 3. Set up the page with 1-inch margins all around. 4. Font: Arial 5. Font Size: 11 6. Line spacing: Single 7. Provide appropriate headings with section numbers, in bold. 8. Use headers and footers. o Name and title of paper in header. o Page numbers centered in the footer. 9. Text should be fully justified. 10. Include a list of your references, also separate from the number of pages of content, at the end of the paper. 11. Create a cover for your report that includes the following: o Title o Prepared for: Course Name and Section o Prepared by: Your name o Date Failure to meet these project report requirements will affect your grade. The report will be graded with respect to content, format, and grammar. Please refer to the grading outline on page 13.
Image of page 6
AVM 3201 – Aviation Planning Case Study Deer Valley Airport – Demand/Capacity Analysis and Site Selection Study Page 7 of 13 Sample Table and Figure Your tables and figures should be numbered, titled, and sourced as shown in the following examples.
Image of page 7
Image of page 8

You've reached the end of your free preview.

Want to read all 13 pages?

  • Summer '18
  • Brett Gordon
  • Visual flight rules, DEER VALLEY AIRPORT

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture