Interior and exterior decorative lighting will be

  • No School
  • AA 1
  • Pownthep
  • 30
  • 100% (6) 6 out of 6 people found this document helpful

This preview shows page 11 - 13 out of 30 pages.

Interior and exterior decorative lighting will be kept at a minimum. Electronics Responsibility Computers and other electronic office equipment are to be turned off when not in use and at the end of the day. New and replacement portable space heaters, refrigerators, microwaves and coffee makers consume large amounts of energy and are not authorized for campus use without prior written approval from Facilities Services. All employees Water Responsibility Water use is to be minimized. Showers and faucets are to be turned off after each use. Cold/cool water will be used whenever possible, unless sanitary or other requirements necessitate the use of hot water. 3) Low flow toilets, showers and faucets are installed whenever possible. All employees 1.4 Develop implementation plan for policies and procedures Inset your response here: Activity Who is responsible Due date Consult with all relevant stakeholders, including health and safety representatives, contractors (particularly those who work with us regularly), and the employees about the policy and procedure. James Bond John Doe Jane Doe 29 October 2019 Draft the sustainability policy and procedure. James Bond John Doe Jane Doe 29 October 2019 Acquire all the necessary resources and personnel to the policy. John Doe 31 November 2019 Publicise the policies and procedures on the company’s intranet. James Bond 2 December 2019 Train all employees in policies and procedures. James Bond 5 December 2019 BSBSUS501 Student Assessment Workbook | Student ID: Page 10
Image of page 11
John Doe Jane Doe Review the policies and procedures regularly James Bond John Doe Jane Doe 29 October 2020 Key Performance Indicators: 1. Total utility consumption from 2 nd of November 2019 to 2 nd November 2020. 2. Waste Recycling Rate from 2 nd of November 2019 to 2 nd November 2020. 3. Water Footprint from 2 nd of November 2019 to 2 nd November 2020. 4. Total Carbon Footprint from 2 nd of November 2019 to 2 nd November 2020. 1.5 Seek approval with policy and procedures plan Upon the receipt of the feedback from your Manager, make the necessary adjustments to your implementation plan and attach the exchange of emails: Email to manager for feedback To: Manager Subject: Sustainability Policy and Procedure Hi, I have drafted the first copy of the sustainability policy and procedure and attach the file with this email. Please review and provide feedback so that I can make further changes. Kind regards, James Bond Project Manager Response from manager Hi, I have reviewed the sustainability policy and procedure that you drafted. I think that we need to assess the employee knowledge after the training is done. Modified implementation plan Activity Who is responsible Due date Consult with all relevant stakeholders, including health and safety representatives, contractors (particularly those who work with us regularly), and the employees about the policy and procedure.
Image of page 12
Image of page 13

You've reached the end of your free preview.

Want to read all 30 pages?

  • Fall '19
  • James Bond, John Doe, Sean Connery, Thunderball

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture