J third party anything used in the product but

  • No School
  • AA 1
  • 5

This preview shows page 3 - 5 out of 5 pages.

J) Third-party - anything used in the product, but developed outside the project. K) Distributed - anything spread out in time or space, yet whose elements must work together. l) Buggy - anything known to have a lot of problems. M) Recent Failure - anything with a recent history of failure. 4. You are in the contract stage of a project and are developing a comprehensive proposal for a safety critical software system. Your director has consulted you for preparing a guideline document what will enlist user’s role during acceptance testing phase. Indicate the key roles you feel that the user should play during acceptance stage. Also indicate the categories into which the acceptance requirements should fall. [10 Marks] Answer: 1) Ensure user involvement in developing systems requirement and acceptance criteria. 2) Identify interim and final products for acceptance their acceptance criteria and schedule. 3) Plan how and by whom each acceptance activity will be performed. 4) Plan resources for providing information. 5) Schedule adequate time for buyer staff to receive and examine the products and evaluation prior to acceptance review. 6) Prepare the acceptance plan. 7) Respond to the analysis of project entitles before accepting and rejecting. 8) Approve the various interim software products. 9) Perform the final acceptance activities, including the formal acceptance testing at delivery. 10) Make an acceptance decision for each product. 5. What is parallel testing and when do we use parallel testing? Explain with example? [5 marks] Answer: Testing a new or an altered data processing system with the same source data that is used in another system. The other system is considered as the standard of comparison. OR we can say that parallel testing requires the same input data be run through two versions of the same application. Parallel testing should be used when there is uncertainty regarding the correctness of processing of the new application. And old and new versions of the applications are same. E.g.- 1) Operate the old and new version of the payroll system to determine that the paychecks from both systems are reconcilable. 2) Run the old version of the application system to ensure that the operational status of the old system has been maintained in the event that problems are encountered in the new application. 6. What is the difference between testing Techniques and tools? Give examples.
Image of page 3
CSTE Mock Test - Part II – Questions Along with Answers Page 4 of 5 [5 marks] Answer: Testing technique: - Is a process for ensuring that some aspects of the application system or unit functions properly there may be few techniques but many tools.
Image of page 4
Image of page 5

You've reached the end of your free preview.

Want to read all 5 pages?

  • Fall '19

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Ask Expert Tutors You can ask You can ask ( soon) You can ask (will expire )
Answers in as fast as 15 minutes