15. Georgia Sausage is looking at a new sausage system with an installed cost of $480,000. This cost will be depreciated straight-line to zero over the project’s five-year life, at the end of which the sausage system can be scrapped for $70,000. The sausage system will save the firm $160,000 per year in pretax operating costs, and the system requires an initial investment in net working capital of $29,000. The net working capital associated with the project can be recovered at the end of the project. If the tax rate is 34% and the discount rate is 10%, what is the NPV of this project? (3 points) Annual depreciation = $96,000 Now, we calculate the aftertax salvage value. The aftertax salvage value is the market price minus (or plus) the taxes on the sale of the equipment, so: Aftertax salvage value = MV + (BV – MV)T Very often the book value of the equipment is zero as it is in this case. If the book value is zero, the equation for the aftertax salvage value becomes: Aftertax salvage value = MV + (0 – MV)T Aftertax salvage value = MV(1 – T) We will use this equation to find the aftertax salvage value since we know the book value is zero. So, the aftertax salvage value is: Aftertax salvage value = $70,000(1 – 0.34) Aftertax salvage value = $46,200 Using the tax shield approach, we find the OCF for the project is: OCF = $165,000(1 – 0.34) + 0.34($96,000) OCF = $138,240 Now we can find the project NPV. Notice we include the NWC in the initial cash outlay. The recovery of the NWC occurs in Year 5, along with the aftertax salvage value. NPV = –$480,000 – 29,000 + $138,240(PVIFA10%,5) + [($46,200 + 29,000) / 1.10^5] NPV = $61,731.65 8
Image of page 9
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern