Which of the following are created as a result of validating project scope

Which of the following are created as a result of

This preview shows page 20 - 24 out of 24 pages.

Which of the following are created as a result of validating project scope? Select one:a. Accepted deliverables and change requests b. Accepted deliverablesc. Change requestsd. Approved change requestsThe outputs of Validate Scope are accepted deliverables and change requests.[Crosswind Manual 5.5; PMBOK® Guide 5.5]The correct answer is: Accepted deliverables and change requests
Image of page 20
1/24/20, 7 : 05 PM Scope Practice Exam (30 Questions) Page 21 of 24 Question 26Which of the following describes a work breakdown structure (WBS)? Correct 1.00 points out of 1.00
Image of page 21
1/24/20, 7 : 05 PM Scope Practice Exam (30 Questions) Page 22 of 24 Question 27Which of the following is a heuristic for WBS decomposition? Correct 1.00 points out of 1.00
Image of page 22
1/24/20, 7 : 05 PM Scope Practice Exam (30 Questions) Page 23 of 24
Image of page 23
Image of page 24