The two trunks between SwitchA and SwitchB need to be configured in a mode that

The two trunks between switcha and switchb need to be

This preview shows page 248 - 251 out of 253 pages.

The two trunks between SwitchA and SwitchB need to be configured in a mode that allows for the maximum use of their bandwidth for all vlans. This mode should be done with a non- proprietary protocol, with SwitchA controlling activation. Propagation of unnecessary broadcasts should be limited using manual pruning on this trunk link. MLS and EIGRP Sim Question You have been tasked with configuring multilayer SwitchC, which has a partial configuration and has been attached to RouterC as shown in the topology diagram. You need to configure SwitchC so that Hosts H1 and H2 can successful ping the server S1. Also SwitchC needs to be able to ping server S1. Due to administrative restrictions and requirements you should not add/delete VLANs, changes VLAN port assignments or create trunk links. Company policies forbid the use of static or default routing. All routes must be learned via EIGRP 650 routing protocol.
Image of page 248
You do not have access to RouterC, RouterC is correctly configured. No trunking has been configured on RouterC. Routed interfaces should use the lowest host on a subnet when possible. The following subnets are available to implement this solution: 10.10.10.0/24 190.200.250.32/27 190.200.250.64/27 Hosts H1 and H2 are configured with the correct IP address and default gateway. SwitchC uses Cisco as the enable password. Routing must only be enabled for the specific subnets shown in the diagram. VTP Lab 2 Question Acme is a small export company that has an existing enterprise network comprised of 5 switches; CORE,DSW1,DSW2,ASW1 and ASW2. The topology diagram indicates their desired pre- VLAN spanning tree mapping. Previous configuration attempts have resulted in the following issues: CORE should be the root bridge for VLAN 20; however, DSW1 is currently the root bridge for VLAN 20. Traffic for VLAN 30 should be forwarding over the gig 1/0/6 trunk port between DSW1 and DSW2. However VLAN 30 is currently using gig 1/0/5. Traffic for VLAN 40 should be forwarding over the gig 1/0/5 trunk port between DSW1 and DSW2. However VLAN 40 is currently using gig 1/0/6. You have been tasked with isolating the cause of these issuer and implementing the appropriate solutions. You task is complicated by the fact that you only have full access to DSW1, with isolating the cause of these issues and implementing the appropriate solutions. Your task is complicated by the fact that you only have full access to DSW1, with the enable secret password cisco. Only limited show command access is provided on CORE, and DSW2
Image of page 249
using the enable 2 level with a password of acme. No configuration changes will be possible on these routers. No access is provided to ASW1 or ASW2. VTP Lab Question The headquarter offices for a book retailer are enhancing their wiring closets with Layer3 switches. The new distribution-layer switch has been installed and a new access-layer switch cabled to it. Your task is to configure VTP to share VLAN information from the distribution-
Image of page 250
Image of page 251

You've reached the end of your free preview.

Want to read all 253 pages?

  • Spring '19
  • Network switch

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture