H A C LOT 1 C=0.6 LOT 3 200 C=03 m K LOT 2 200m C =07 200 LOT 4 m C=03 100m H 0 C G 100m- ><100m-> <100m-> In the area shown in the...


Can you give the answers to the question attached? Thanks in advance.Untitled.png

Untitled.png

Q8.
H
A
C
LOT 1
C=0.6
LOT 3
200
C=03
m
K
LOT 2
200m
C =07
200
LOT 4
m
C=03
100m
H
0
C
G
100m-
><100m-> <100m->
In the area shown in the above figure:
Lot 1 (ABKJ) drains to Pit J with a total flow time of 10 mimites.
Lot 2 (HIJK) drains to Pit I with a total flow time of 12 minutes.
Lot 3 (part) (BCDGHK) drains to Pit H with a total flow time of 30 minutes
Lot 4 (remainder) (DEFG) drains to Pit G with a total flow time of 25 minutes.
Pipe travel times are:
GH = HI = 1min
JI = 2 mins
The rainfall intensity for the design ARI is
Duration (min)
10
12
14
16
18
20
2.2
Intensity (mm/h)
100
88.2
79
71.4
65.2
60
55.6
Duration (on)
24
26
28
30
32
34
Intensity (mm h)
51.7
48.4
45.5
42.9
40.5
38.5
Calculate the required capacity of the pits G, H, I and J.
Calculate the required capacity of the pipe GH, HI, JI and the pipe discharging
from the site.

Recently Asked Questions

Why Join Course Hero?

Course Hero has all the homework and study help you need to succeed! We’ve got course-specific notes, study guides, and practice tests along with expert tutors.

-

Educational Resources
  • -

    Study Documents

    Find the best study resources around, tagged to your specific courses. Share your own to gain free Course Hero access.

    Browse Documents
  • -

    Question & Answers

    Get one-on-one homework help from our expert tutors—available online 24/7. Ask your own questions or browse existing Q&A threads. Satisfaction guaranteed!

    Ask a Question