Senior Project - Systems Analysis and Design Systems are made up of elements that work together to accomplish an objective.
Solved by Expert Tutors
Question

Senior Project - Systems Analysis and Design·        Questions # 1, 2, 3, 4, 5 and 6

Systems are made up of elements that work together to accomplish an objective. A system may be physical or conceptual, and may include an organization or company, may process information or may provide some other function. Here is your opportunity to review what you have learned about the project management process of the SDLC. Complete the following assignment:

·        Your assignment should be at least 1 full page


  1. Describe how projects are selected in organizations.
  2. Describe how project portfolio management is used by IT departments.
  3. Describe the major elements and issues with waterfall development.
  4. Describe the major elements and issues with parallel development.
  5. Describe the major elements and issues with the V-model.
  6. Describe the major elements and issues with iterative development.



Part 2 questions

These are mostly just true false and some multiple choice

A critical success factor for project management is to start with a realistic assessment of the work that needs to be accomplished.

True

False

 

Which of the following project roles would focus on stakeholder requirements?

Systems analyst

Business analyst

Infrastructure analyst

Change management analyst

Requirements analyst

 


The outcome of the design phase is the:

Feasibility Analysis document

System proposal document

System specification document

System request document

Business Process document

 

The project methodology that takes the longest to complete is Extreme Programming Methodology.

True

False

 


The outcome of the analysis phase is the:

Feasibility Analysis document

System proposal document

System specification document

System request document

Business Process document

 


The Waterfall Methodology breaks the overall project into a series of release versions.

True

False

 

The project methodology that takes the longest to complete is the Waterfall Development Methodology.

True

False

 

Which of the following project roles would serve as a primary point of contact for a project?

Systems analyst

Business analyst

Infrastructure analyst

Change management analyst

Project manager

 

Projects can be classified by: size, cost, purpose, length, programming language and hardware platform.

True

False

 

In most IT departments, the demand for IT projects is generally about the same as the department’s ability to supply them.

True

False

Sign up to view the entire interaction

Step-by-step answer

ipsum dolor sit amet, consacinia pulvi

ac, dictum vitae odio. Donec al

ur laoreet. Nam risus ante, dapibus a molestie consequat, ultrices ac magna. Fusce dui lectus, congue vel laoreet ac, dictum vitae odio. Donec aliquet. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nam lacinia pulvinar

Part 1 questions.docx
Fusce ipiscing elit. Nam lacinia pulvinar tortor nec facilisis. P gue vel laoreet ac, dictum vitae odio. Donec aliquet. Lorem ipsum dolor sit amet, consectetur a ur laoreet. Nam risus ante, d

Subscribe to view the full answer

Why Join Course Hero?

Course Hero has all the homework and study help you need to succeed! We’ve got course-specific notes, study guides, and practice tests along with expert tutors.

  • -

    Study Documents

    Find the best study resources around, tagged to your specific courses. Share your own to gain free Course Hero access.

    Browse Documents
  • -

    Question & Answers

    Get one-on-one homework help from our expert tutors—available online 24/7. Ask your own questions or browse existing Q&A threads. Satisfaction guaranteed!

    Ask a Question
Let our 24/7 Computer Science tutors help you get unstuck! Ask your first question.
A+ icon
Ask Expert Tutors You can ask You can ask You can ask (will expire )
Answers in as fast as 15 minutes