View the step-by-step solution to:

5204_Assign A.

Can i get the answer for the assignment plz

ELEC 5204 Mid-semester Assignment, 2009 P 1 of 6 5204_Assign A.doc UNIVERSITY OF SYDNEY – SCHOOL OF ELECTRICAL ENGINEERING ELEC 5204 POWER SYSTEMS 2010 Mid-Semester Assignment A – Design of an Urban HV Distribution Network ** This assignment is due Monday 17 May, 2010 . ** Introduction The objective of this assignment is to do the basic planning and protection design of the sub-transmission and high voltage distribution network of a typical suburban “zone” substation. It has been designed to tie in with system studies to be done on the Power System Simulator in the power systems laboratory (the lab work will enable you to confirm a number of the relay settings determined as part of this assignment). A zone substation steps “sub-transmission” voltages of 33 kV down to “high voltage distribution” voltages of 11 kV. Distribution substations on the 11 kV feeders in turn step voltages down to 415 volts for domestic and commercial use. The sub- transmission system is fed by a grid supply substation, modelled in this exercise by a single 132kV/33kV star-star transformer (but in reality would be several transformers in parallel). From this a sub-mesh of 33kV lines feed the sub-transmission network, modelled in this exercise by a single equivalent line. All impedances are shown on the diagram. The zone substation will be constructed in two stages: initially two 25 MVA 33/11kV transformers supplying 8 outgoing 11kV feeders and ultimately three 25 MVA transformers and 15 outgoing 11kV feeders. The feeders are not uniformly loaded at any one time, so a “diversity factor” of 0.7 should be applied to the 11kV feeder cable rating. For sake of analysis, the supply area can be assumed to be roughly circular and of uniform load (refer fig 1). Initial load density (i.e. the average electrical load on the network) will be 1.5 MVA/km 2 and the ultimate load density 3 MVA/km 2 . On the basis of reliability, the substation always runs one of its transformers as a spare, i.e. the design capacity of a 2 transformer substation is only the rating of one and that of a 3-transformer substation is the capacity of 2 transformers. No spare capacity is proved at local distribution substations. The 11kV network is run as a “ring-main” system, where any 2 feeders can carry the load of 3 (i.e. the design capacity of the cables is based on an average load equal to 2/3 of the cable maximum rating). However, all the feeders in practice do not hit peak load at the same time and a “diversity factor” of 0.7 should be applied (zone substation load = 0.7 * individual feeder peak loads; conversely an individual feeder peak load = zone sub load/no of feeders/0.7). The distribution substations will vary in size from “kiosk” types of 750 kVA capacity to commercial designs of 1500 kVA capacity. All the zone and distribution transformers are 3-phase, delta-star types (delta on the HV, earthed star on the LV). The substations and network are all three-phase, 50 Hz.
Background image of page 1
ELEC 5204 Mid-semester Assignment, 2009 P 2 of 6 The Design Task The design task is as follows. Analyse the system and recommend:- Confirm the suitability of the zone transformer impedance, The distribution transformer impedances (for both 1500 and 750 kVA sizes), The 11kV cable size, The zone substation transformer 11 kV CT ratio, to suit the transformer’s differential protection scheme (allow for star-delta transformation), The zone substation transformer overcurrent and earth fault relay settings on HV (33kV) and LV (11kV) sides (relays ‘A’ and ‘B’), The sub-transmission feeder overcurrent and earth fault relay settings, The 11 kV feeder overcurrent and earth fault relay setting (relay ‘C’), The HV overcurrent relay setting on both the 1500 and 750 kVA distribution transformers (relays ‘D1’ and ‘D2’). Refer to figure 2 for the A, B, C and D relays locations. There are both differential and overcurrent relays on each side of zone substation transformer, and overcurrent relays on each outgoing 11 kV feeder, and on the HV side of each distribution substation. The zone substation transformers have 500:5 Amp CTs on the 33kV side, and a choice of 1200:5, 1500:5 or 1800:5 on the 11kV side. The 11 kV feeders have 400:5 Amp CTs and for the distribution transformers, there is a choice of 60:5, 80:5, 100:5 or 150:5 Amp CTs. The primary rating CTs on the 11kV side of the zone substation transformers will be chosen to suit the differential protection and the overcurrent relays will have the same CT ratio. All CT secondaries (and hence also all overcurrent relays) will be 5 amps. You will have to specify the secondary current rating on the 11 kV sides of the differential relays on each zone substation transformer. System Diagrams Fig 1 -Idealised Diagram of Supply Area, for Initial (25 MVA, 8 feeder development) Supply area 11kV feeders Distribution substations Zone substation
Background image of page 2
Show entire document

Recently Asked Questions

Why Join Course Hero?

Course Hero has all the homework and study help you need to succeed! We’ve got course-specific notes, study guides, and practice tests along with expert tutors.

-

Educational Resources
  • -

    Study Documents

    Find the best study resources around, tagged to your specific courses. Share your own to gain free Course Hero access.

    Browse Documents
  • -

    Question & Answers

    Get one-on-one homework help from our expert tutors—available online 24/7. Ask your own questions or browse existing Q&A threads. Satisfaction guaranteed!

    Ask a Question