You are required to submit at the end of the semester a final project in which you will determine whether PowerCo should construct a new generator to meet an expected rise in demand for power. You will arrive at your conclusions by analyzing the data below and answering a series of interrelated questions. You will present your findings and recommendations in a report, the details of which are listed below in the section "PowerCo: Your Analysis and Report."



PowerCo: The Data

Consider the following situation: PowerCo, a medium-sized power company, generates and sells electricity throughout several states in the southeast United States. The company has been in business for over 30 years and is the largest power generator in the region. The company believes that a significant increase in the demand for electricity over the next 10-12 years will cause it to be unable to meet the expected demand with its current generation capabilities.

PowerCo’s senior management believes that they must build a new generator to meet this increased demand and their Treasury department was tasked with developing the financial projections for building a new generator. Taking the expected revenues from the new facility, which were developed by the firm's economists, and the expected costs of building the new plant, which were provided by the firm's engineers, the Treasury department has developed financial projections to allow it to analyze the prospective investment in a new generating facility.

It is expected that building the new generator will take approximately two years and will remain functional for at least 10 years. While Treasury expects that the facility will continue to generate electricity for longer than 10 years, the department believes that financial projections for a period longer than 10 years are too uncertain and so has limited its estimates to 10 years of use.

The financial projections, given on an annual basis in after-tax dollars, are as follows (assume all cash flows occur at the end of the year):

The expected cash costs, in millions of dollars, of building the facility:

Year Expected Costs
1 25
2 28



The expected profits from the sale of electricity, in millions of dollars:

Year Expected after-tax profits
3 6
4 7
5 8
6 9
7 9
8 9
9 9
10 9
11 9
12 9



The firm believes that its opportunity cost of capital is 8 percent and so will use that rate to evaluate the project.


PowerCo: Your Analysis and Report

Answer questions 1-5 listed below in the section "PowerCo Analysis Questions," analyzing the data presented in the "Data" section above. After answering the five questions, you will need to assemble your answers to form your final project, which should be presented in the following way:

Title page with your name, date, course code, and name of your mentor.
Introduction to your analysis (briefly state your purpose).
The main body of your analysis (i.e., your answers to questions 1-4, below).
Recommendations (your answer to the last question below).
You are not required to follow a particular style of presentation, but whichever one you use, you must be consistent.



PowerCo Analysis Questions

Your answers to the following questions will form the main body of your case analysis.

What is the present value of the expected costs? Show all calculations.
What is the present value of the expected after-tax cash profits? Show all calculations.
What is the expected net present value (the difference between the PVs of the inflows and outflows)? Show the calculations. What does this number represent? Be detailed in your responses.
What are the risks inherent in deciding to build the facility? How would each of the risks affect the decision to build the facility? Be specific.
Should PowerCo build the plant? Why or why not?
When you are ready to submit your final project, click the View/Complete Assignment link at the bottom of this page, and then use the Browse button to locate and attach your assignment file. Click to turn in the assignment. Consult the course Calendar for the final project's due date.



Final Project

>> View/Complete Assignment: Final Project

This question was asked on Jan 30, 2013.

Recently Asked Questions

Why Join Course Hero?

Course Hero has all the homework and study help you need to succeed! We’ve got course-specific notes, study guides, and practice tests along with expert tutors and customizable flashcards—available anywhere, anytime.

-

Educational Resources
  • -

    Study Documents

    Find the best study resources around, tagged to your specific courses. Share your own to gain free Course Hero access or to earn money with our Marketplace.

    Browse Documents
  • -

    Question & Answers

    Get one-on-one homework help from our expert tutors—available online 24/7. Ask your own questions or browse existing Q&A threads. Satisfaction guaranteed!

    Ask a Question
  • -

    Flashcards

    Browse existing sets or create your own using our digital flashcard system. A simple yet effective studying tool to help you earn the grade that you want!

    Browse Flashcards