Solved by Expert Tutors
Solved by Expert Tutors
Question

Problem 7-16 (Algo)<br/>Burrito King (a new fast-food franchise opening

up nationwide) has successfully automated burrito production for its drive-up fast-food establishments. The Burro-Master 9000 requires a constant 40 seconds to produce a batch of burritos. It has been estimated that customers will arrive at the drive-up window according to a Poisson distribution at an average of one every 45 seconds. To help determine the amount of space needed for the line at the drive-up window, answer the following questions.


a. What is the average waiting line length (in cars)? (Do not round intermediate calculations. Round your answer to 2 decimal places.)






b. What is the average number of cars in the system (both in line and at the window)? (Do not round intermediate calculations. Round your answer to 2 decimal places.)






c. What is the expected average time in the system, in minutes? (Do not round intermediate calculations. Round your answer to 2 decimal places.)

Step-by-step answer

dictum vitae odio. Donec aliquet. Lorem ipsum doloracinia pulvi

2.PNG

ultrices ac magna. Fusce dui lectus, congue vel laoreet ac, dictum vitae odio. Donec aliquet. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nam lacinia pulvinar tortor nec fa

2.PNG
r

Subscribe to view the full answer

Why Join Course Hero?

Course Hero has all the homework and study help you need to succeed! We’ve got course-specific notes, study guides, and practice tests along with expert tutors.

  • -

    Study Documents

    Find the best study resources around, tagged to your specific courses. Share your own to gain free Course Hero access.

    Browse Documents
  • -

    Question & Answers

    Get one-on-one homework help from our expert tutors—available online 24/7. Ask your own questions or browse existing Q&A threads. Satisfaction guaranteed!

    Ask a Question