View the step-by-step solution to:

Peter and Harry Haygood are building contractors who specialize in the construction of private home dwellings, storage warehouses, and small...

I. Peter and Harry Haygood are building contractors who specialize in the construction of private home dwellings, storage warehouses, and small businesses (less than 20,000 sq. ft. of floor space). Both Peter and Harry entered a carpenter union’s apprenticeship program in the early 2010s and, upon completion of the apprenticeship, became skilled craftsmen in 2016. Before going into business for themselves, they worked for several local building contractors in the Detroit area. Typically, the Haygood Brothers submit competitive bids for the construction of proposed dwellings. Whenever their bids are accepted, various aspects of the construction (electrical wiring, plumbing, brick laying, painting, and so forth) are subcontracted. Peter and Harry, however, perform all carpentry work. In addition, they plan and schedule all construction operations, frequently arrange interim financing, and supervise all construction activities. The philosophy under which the Haygood Brothers have always operated can be simply stated: “Time is money.” Delays in construction increase the costs of interim financing and postpone the initiation of their building projects. Consequently, they deal with all bottlenecks promptly and avoid all delays whenever possible. To minimize the time consumed in a construction project, the Haygood Brothers use PERT. First, all construction activities and events are itemized and properly arranged (in parallel and sequential combinations) in a network. Then time estimates for each activity are made, the expected time for completing each activity is determined, and the critical (longest) path is calculated. Finally, earliest times, latest times, and slack values are computed. Having made these calculations, Peter and Harry can place their resources in the critical areas to minimize the time of completing the project. The immediate predecessors and the optimistic (a), most likely (m), and pessimistic (b) time estimates, are shown in the following table. ACTIVITY Description Immediate Predecessor DAYS a m b A Arrange financing - 4 5 6 B Let subcontracts A 4 10 16 C Set and pour foundations B 5 7 9 D Plumbing B 4 5 6 E Framing C 2 4 6 F Roofing E 6 10 14 G Electrical wiring E 4 5 6 H Installation of windows and doors E 6 10 14 I Ductwork and insulation (including heating and cooling units) E 5 7 9 J Sheetrock, paneling, and paper hanging D, I 10 11 12 K Bricking F, G, H, J 7 8 9 L Installation of cabinets F, G, H, J 4 6 8 M Inside trim (including fixtures) L 5 7 9 N Outside trim K 3 5 7 O Painting M 5 6 7 P Flooring N, O 4 6 8 Required: (a) Construct a network for this project. (b) Determine the expected time to complete this project. (c) Identify the critical path. (d) Determine ES, EF, LS, LF and Slack time for each activity. (e) What is the probability that the project will be completed in 58 days or less?
Sign up to view the entire interaction

Top Answer

find the answer... View the full answer

Doc24.docx

Sign up to view the full answer

Why Join Course Hero?

Course Hero has all the homework and study help you need to succeed! We’ve got course-specific notes, study guides, and practice tests along with expert tutors.

-

Educational Resources
  • -

    Study Documents

    Find the best study resources around, tagged to your specific courses. Share your own to gain free Course Hero access.

    Browse Documents
  • -

    Question & Answers

    Get one-on-one homework help from our expert tutors—available online 24/7. Ask your own questions or browse existing Q&A threads. Satisfaction guaranteed!

    Ask a Question
Ask a homework question - tutors are online