Solved by Expert Tutors
MM305 UNIT 9 PROJECT Name: Directions: The following software may be used: You may be required to also upload original files from Excel or QM for...
Solved by Expert Tutors
Question

Hello can you please review this for me.  I need a second option Thanks

MM305 UNIT 9 PROJECT Name: Directions: The following software may be used: o Excel->Data Analysis o Excel QM o QM for Windows (PC only) Please make sure to insert your answers, including any charts, graphs, or output, on this document. You may be required to also upload original files from Excel or QM for Windows. The calculations are not your final answer. A summary/explanation in your own word for each question posed should be included. Question 8, 9 and 10 use the States Data File to run some calculations. Resulting output is already provided for you. You do NOT need to run any calculations on the States Data File. Be sure to put your name on this document and save it to your computer. Upload this Word document as your Unit 7 submission in the course Drop Box. 1. Allen Machines specializes in developing weed-harvesting equipment that is used to clear small lakes of weeds. Allen Machines is contemplating the construction of a machine that would harvest weeds on narrow rivers and waterways. The activities and time in weeks necessary to build one of these experimental machines are shown in the table below. Activity Immediate Predecessors Time in Weeks A none 3 B A 5 C B 4 D B 3 E C,D 2 F A 1 G D,E 2 H D,F 3 1. What is the minimum possible time required for completing the project? 2. What is the latest possible time that Activity F may be started without delaying the completion of the project? 3. What is the latest finish time for Activity H? 4. What is/are the critical path(s)? Explanation: (Please include Gantt Chart and/or Network Graph): 1
Background image of page 1
MM305 UNIT 9 PROJECT 2. The following is the activity and associated costs for the renovation of the local high school football stadium. The times are in weeks. Explanation : You can enter the above information into QM for Windows->Project Management,->Cost Budgeting. Activity Immediate Predecessor Time Cost ($) A - 5 10,000 B - 3 25,000 C A 7 15,000 D C 1 30,000 E A, B 1 20,000 F E 1 12,000 G C, D 5 56,000 H F 1 20,000 1. What is the critical path and total time required for this project? Answer: Explanation: (include Gantt Chart and/or Network Graph): 2. How much of the total (cumulative) budget would be spent in Week 8 (Period 8) with the earliest start budget? Answer: Explanation (include cost budgeting table): 2
Background image of page 2
Show entire document
Sign up to view the entire interaction

Step-by-step answer

consectetur adipiscing elit. Nam lacinia pulvinar tortor nec facilisis. Pellentesque dapibus efficitur laoreet. Nam risus ante, dapibus a molestie consequat, ultrices ac magna. Fusce dui lectus, congue vel laoreet ac, dictum vitae odio. Donec aliquet. Lorem ipsum dolor sit amet, consectetur adip

sque dapibus efficitur laor

Solution Q1.docx
ec facil i o a g l , s dictum vitae odio s m a s a e a acinia pulvinar , consectetu llentes acinia acinia icitur l llentes e vel la iscing elit. Nam lacinia pulvinar tortor nec facilisis. Pellent

Subscribe to view the full answer

Why Join Course Hero?

Course Hero has all the homework and study help you need to succeed! We’ve got course-specific notes, study guides, and practice tests along with expert tutors.

  • -

    Study Documents

    Find the best study resources around, tagged to your specific courses. Share your own to gain free Course Hero access.

    Browse Documents
  • -

    Question & Answers

    Get one-on-one homework help from our expert tutors—available online 24/7. Ask your own questions or browse existing Q&A threads. Satisfaction guaranteed!

    Ask a Question
Let our 24/7 Statistics and Probability tutors help you get unstuck! Ask your first question.
A+ icon
Ask Expert Tutors You can ask You can ask You can ask (will expire )
Answers in as fast as 15 minutes