Question
Answered step-by-step

1. A __________ is a GCSS-Army component that represents a particular

Army Unit, logistics element, or cost capturing entity. a. Force Element (FE)
b. Plant
c. Cost Devision
d. Storage Location
2. Which transaction code (T-Code) is used to display a Unit's Organizational structure? (Force Element, Storage Location, Property, Personnel, and what a unit is allowed to request) a. /n/ISDFPS/DISP_MAT_SIT
b. IW30
c. /n/ISDFPS/LSP2
d. ZORGSTRUC
3. Which transaction code (T-Code) is used to identify the details associated with a DoDAAC, MRP area, Storage Location, and supporting supply organization. a. /n/ISDFPS/LSP2
b. ZMRP
c. ZSBU
d. ZFE
4. True or False? A Technical Status is set by the User to identify the severity of a notification (fault or shortcoming) for a piece of equipment. a. True
b. False
5. Which operational status symbol is used to indicate the equipment non-mission due to a maintenance requirement? a.
b.
c.
d.
6. Work orders are created and managed from the Equipment Situation Report. Which of the following represents a refurbishment order? a. PM01
b. PM04
c. PM06
d. STND
7. True or False? A functional location structure is a hierarchical structure representation of a system/sub-system/end item. a. True
b. False
8. Using the Functional Location Structure example below; which equipment is currently NOT installed into the Functional Location Structure?
a. The combat tank
b. The M1A1 engine
c. The digital computer set
d. The transmission
9. Which notification type is used to create a one-time individual equipment dispatch? a. ED
b. D1
c. D2
d. O1
10. Which transaction is used to display the workflow message indicating the approval authority's equipment dispatch request decision? a. IW22
b. LSP2
c. IW23
d. SBWP
11. Which transaction code (T-Code) is used to create a project work order? a. /n/ISDFPS/DISP_EQU_SIT
b. IW28
c. IWBK
d. IW31
12. Which of the following work centers is never entered in the Main Work Ctr field of a work order? a. A Production Control Section work center with an existing relationship
b. A Maintenance Control Section work center with an existing relationship
c. A Maintenance Control Section work center without an existing relationship
d. A Commodity Shop work center being assigned work
13. What triggers the dismantle/install process? a. The equipment serial number history report
b. Material Situation Report
c. Goods movement for a work order
d. The removal of the end item
14. After the technical completion button in the overall completion process is selected, how is the operational status updated? a. By closing the work order
b. The status is updated automatically
c. The Set User Status dialog box prompts the User to update the operational status
d. A batch run will update is at the end of each day
15. General maintenance task lists define which requirement for a maintenance task or activity? a. Which operation is performed
b. What Material Component is required
c. Both A & B
d. None of the above
16. True or False? The Service schedule displays the date in which the maintenance call was completed as well as the maintenance calls that are due for processing? a. True
b. False
17. Which aging indicator displays in the Recoverable/Reparable Conversion by Material (YOBUX) transaction if the return (ZRL or ZRX) PR is 15 days olds? a.
b.
c.
d.
18. True or False? When executing the MI24 transaction, you are in search of open active inventories. a. True
b. False
19. Which Action, Reference Document, and Movement Type posting selections are used to post goods issue bench stock material to a Unit's Cost Center? a. A07 Goods Issue, R10 Other, and 201
b. A07 Goods Issue, R10 Other, and 221
c. A07 Goods Issue, R10 Other, and 261
d. A06 Goods Receipt, R10 Other, and 501
20. Which of the following items are not displayed in the Order Status Report? a. Issue Storage Location
b. Purchasing Document Number
c. Material quantity ordered, received, and issued
d. The mode of shipment

Answer & Explanation
Verified Solved by verified expert
<p>ce dui lectus, congue vel laoreet ac, dictum vitae odio. Donec aliquet. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nam lacinia pulvinar tortor nec facilisis. Pellentesque dapibus efficitur laoreet. Nam risus ante, dapibus a molestie consequat</p> Fusce dui lectus, congue vel laoreet ac, dictum vitae odio. Donec aliquet

Unlock full access to Course Hero

Explore over 16 million step-by-step answers from our library

Subscribe to view answer

sequat, ultrices ac magna. Fusce dui lectus, congue vel laoreet ac, di

ec aliquet. Lorem

amet, conse

gue vel laore

tesque dap

s ante, dapibus a molestie consequat, ult

usce dui lectus, congue vel

Step-by-step explanation

or nec facilisis. Pellentesque dapibus efficitur laoreet. Nam risus ante, dapibus a molestie consequat, ultrices ac magna. Fusce dui lectus, congue vel laoreet ac, dictum vitae odio. Donec aliquet. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nam lacinia pulvinar tortor nec facilisis. Pellentesque dapibus efficitur laoreet. Nam risus ante, dapibus a molestie consequat, ultrices ac magna. Fusce dui lectus, congue vel laoreet ac, dictum vitae odio. Donec aliquet. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nam lacinia pulvinar tortor nec facilisis. Pellentesque dapibus